new_banner

Qingdao Puhua Heavy Industry Paint Room Maintenance Guide: Core Strategies for Long-term Operation and Environmental Compliance

10 / Jun . 2025



Daily maintenance: key steps to ensure basic performance


Air filtration system cleaning


Primary/medium efficiency filter: clean the surface paint mist floccules after each shift, and replace the filter cotton when the dust thickness exceeds 1 cm or the resistance doubles.


High-efficiency filter cotton: visually check the uniformity of light transmission, and replace it immediately if local dark spots appear (normal life is about 400 hours).


Maintenance of paint mist treatment device


Wet water cyclone/Venturi spray booth: clean the trough to settle paint residue daily and keep the water level at the standard line; check the pH value of circulating water weekly (preferably maintained at 6-8), and add neutralizer when the acidity exceeds the standard.


Dry spray booth: check the saturation of activated carbon fiber board or paper filter box, and replace it when the paint mist adhesion reaches 80 or the air flow resistance increases by 50.


Sealing inspection


Test the closing gap of the door of the room body, and the rubber sealing strip has no hardening and cracking; the micro-positive pressure value is stable in the range of 15-30 Pa.


Main points for special maintenance of four types of spray booths


Wet water cyclone type


Clean the scale at the throat of the Venturi tube every month to prevent uneven water flow distribution from reducing the paint mist capture rate.


Wet Venturi type


Check the corrosion of the booster pump impeller quarterly, and replace it if the thickness is reduced by more than 30.


Wet water curtain type


Adjust the uniformity of the overflow water curtain every week to ensure that there is no interruption area.


Dry spray booth


Replace VOC adsorption materials every 200 hours to avoid secondary pollution.




Puhua Heavy Industry Value-added Service System


Dynamic maintenance plan

Customize the filter material replacement cycle according to the local climate (such as high humidity in coastal areas and dry inland areas), and increase the frequency of dehumidifier maintenance during the rainy season in the south.


Global spare parts support

Warehouses in the United States, Mexico, and Vietnam always have 15 types of core components such as high-efficiency filter cotton and hydrocyclone blades.


Intelligent monitoring upgrade

Optional pressure difference/temperature and humidity sensor group, real-time push equipment status to the mobile phone, unplanned downtime reduced by 50